This is for the past three days. As you can see quite a bit has been done and the house is now dried in. A LOT of the work has been done on the inside as regards applying required bracing to all of the components. Most all of the bracing consists of metal brackets nailed between 2x4s to really ‘lock’ them together. A whole lot more bracing. Quite different from how houses use to be built.
13-August
Just one shot of the workers and you can see the roof is starting to go up.
14-August
The roof is up and is covered with ‘felt’. Not really felt as it use to be but a plastic version of it.
15-August
Well, this is the dried in version. Roof all don and vapor installation now applied. Not sure where they go next but guess I will find out next week.