Since the last post, about a couple of weeks ago, not much had been done as there had to be an inspection by the Fairhope inspectors. After the piping, electrical and HVAC install there is one last ‘major’ inspection. Reason being that now the wall insulation and drywall goes up and that would hide anything that had previously been done. As you can see from the first two photos the wall insulation has been done – these were taken on 4-Sep (Friday). Went back yesterday (6-Sep) and they had dropped the brick. So, I guess the next thing will be the drywall on the inside and the bricking on the outside. Expect them to start that Tuesday, Monday is the Labor Day holiday.